Project Strategy

All works are done in a professional and discreet manner and no disturbance shall be caused during the entire duration of the works. Only trained and qualified personnel will be allowed to work.


    1 - Coordination and approval of maintenanceworks.


    2 - Every worker has a proper PPE and Tools for the required job.


    3 - The person-in-charge distributes the works and everything is documented.


    4 - Proper communication devices as per job requirement.


    5 - Housekeeping - All areas must be cleaned after finishing of each activity.

PM and CM Activiteis

There are a few basic activities associated with preventive maintenance.
• Inspections
• Servicing
• Lubrication
• Fastening


Inspections - look for damage, alignment, leaks, cracks, etc. All which indicate either an element of the equipment has failed or is about to fail. Some inspection may include measuring and monitoring wear or degradation of performance while still in the operating specification. The data enables the team to predict the appropriate time to repair, refurbish or replace the equipment.


Servicing - may include alignment, cleaning, clearing or replacing filters, and verifying sensor operation. These are just a few examples and each piece of equipment may require one or more periodic PM tasks.


Lubrication - includes topping off oils or other fluids and at times flushing and replacing the fluid. Advanced PM work may include analysis to determine the working condition of the equipment, nature of wear, or timing for lubrication change. The analysis may also detect contamination.


Fastening - includes the initial equipment installation along with PM work to check the fastening system has maintained the equipment in its proper location and alignment. As elements are removed for inspection or replacement, the re-attachment must also meet the requirements of torque and equipment alignment.